Growing the Vision

Why are we building?

God has already provided more bunk space for more teens to come to camp.
(See that story here!)

The next step is being able to feed them and lead them in worship & teaching in a space that holds them all without the sardine effect.

We are building a “Fieldhouse” to provide a commercial kitchen, enlarged dining space, enlarged teaching & worship space, staff offices centrally located, and the camp store centrally located.

Phases of Building

  • Land Clearing

    Prepare the land for the building.

  • Architectural drawings/renderings

    Have the building plan drawn up and laid out.

  • Foundation

    Footings, Basement Walls, Basement Slab installed

  • Main Flour

    SubFloor, Framing and Sheeting

  • Main Frame

    Steel Building Installed with Roofing

  • Interior

    Framing, Subcontractor Rough-Ins, Interior Finishes

  • Exterior

    Exterior Trim, Painting, Landscaping, Etc

  • Your greatest strength is the intentionality with everything and everyone. Your greatest weakness: need more space.

    — 2023 summer group youth leader

  • Space capacity for meals is a struggle.

    — 2023 Camp Group Youth Leader